DBIA Rocky Mountain Regional Conference - Digitally Delivered Design-Build Quality Management: Improve Owner Control and Design-Builder Operation with Cost-Effective, Fully Digital Quality Management (Transportation)(May 1, 2025)

  • Register
    • Non-member Practitioner - Free!
    • Practitioner Member - Free!
    • Student Member - Free!
    • Owner Member - Free!
    • Academia Member - Free!
    • Industry Partner Academia Member - Free!
    • Industry Partner Practitioner Member - Free!
    • Industry Partner Owner Member - Free!

The Progressive Design-Builder envisioned a project where quality and collaboration were high. Tumult is often experienced between the Design-Builder and Owner Oversight (Owner Advisor and Owner Employees) with respect to quality management roles and responsibilities — creating heavy cost, schedule, and quality impacts. Using the US-89 Progressive Design-Build (the first PDB in Utah) as a project case study, we will explain how the Horrocks team came to develop an Integrated Quality Plan (IQP) and the many benefits this tool can pose for any Design-Build project.

Key:

Complete
Failed
Available
Locked
Certificate of Completion
1.00 CEH credit  |  Certificate available
1.00 CEH credit  |  Certificate available